Skip to product information
The UH-1H was an improved UH-1D, with the Lycoming T53-L-13 engine of 1,400 shp (1,000 kW) installed, plus the pitot tube relocated from the nose to the roof, to reduce ground damage to it. "Hotel" models were created by upgrading "Deltas" with the more powerful engine. The first YUH-1H flew in 1966 with deliveries of production models starting in September 1967.
The "Hotel" model Huey was produced in larger numbers than any other model, with 4,850 delivered to the US Army alone. The "Hotel" model was widely exported and was also built under license in Germany, Italy, Japan and Taiwan. Bell UH-1 Iroquois variants - Wikipedia
The "Hotel" model Huey was produced in larger numbers than any other model, with 4,850 delivered to the US Army alone. The "Hotel" model was widely exported and was also built under license in Germany, Italy, Japan and Taiwan. Bell UH-1 Iroquois variants - Wikipedia