Skip to product information
1/35 Trumpeter German Entwicklungsfahrzeug E-100 Super Heavy Tank - 384 - MPM Hobbies
1/35 Trumpeter German Entwicklungsfahrzeug E-100 Super Heavy Tank - 384 - MPM Hobbies
1/35 Trumpeter German Entwicklungsfahrzeug E-100 Super Heavy Tank - 384 - MPM Hobbies
1/35 Trumpeter German Entwicklungsfahrzeug E-100 Super Heavy Tank - 384 - MPM Hobbies
1/35 Trumpeter German Entwicklungsfahrzeug E-100 Super Heavy Tank - 384 - MPM Hobbies
1/35 Trumpeter German Entwicklungsfahrzeug E-100 Super Heavy Tank - 384 - MPM Hobbies
1/35 Trumpeter German Entwicklungsfahrzeug E-100 Super Heavy Tank - 384 - MPM Hobbies
1/35 Trumpeter German Entwicklungsfahrzeug E-100 Super Heavy Tank - 384 - MPM Hobbies
1/35 Trumpeter German Entwicklungsfahrzeug E-100 Super Heavy Tank - 384 - MPM Hobbies
1/35 Trumpeter German Entwicklungsfahrzeug E-100 Super Heavy Tank - 384 - MPM Hobbies
1/35 Trumpeter German Entwicklungsfahrzeug E-100 Super Heavy Tank - 384 - MPM Hobbies

1/35 Trumpeter German Entwicklungsfahrzeug E-100 Super Heavy Tank - 384

$54.04 $72.99
Free CONUS Economy Shipping on All Orders $100.00 or More
*This is a product we must order from a distributor. Expect shipment within 14 business days or up to 30 business days for this product to come to MPM Hobbies. Products listed as back or pre-orders may take longer than 30 days. Distributor product availability may change without the knowledge of MPM Hobbies. Should this occur, we will notify you via email, text or phone call. Please read our "Shipping Policy" for details on mixed orders i.e orders containing both in-house and products we must order from the distributor.*
SKU: TRP384
Try Lay-Buy at checkout. Minimum of 20% down and maximum 6 months "Lay Away" plan. Your product will be shipped after balance is paid. Pre-orders will ship after balance is paid in full and product becomes available. Select "PUT IT ON LAY-BUY' at checkout and spread out those payments. Terms and restrictions apply.

E-100 Ausf B (hypothetical) is a super heavy tank designed as an alternative to the Maus, It uses a modified Maus turret with the 150 mm KwK 44, with plans to upgrade it to the 170 mm KwK 44 later. Development of the E-100 started in June 1943 & continued steadily until 1944, when Hitler stopped all development of super-heavy tanks. But even though three engineers carried on the work at a low priority, by the end of the war, they managed to nearly finish the first prototype, which only needed a turret. The only prototype was sent to England after the allies captured it & scrapped post-war.

Weight: 140t
Crew: 5
Engine: Maybach HL 234
Speed: 40 km/h
Range: 120 km
Length: 10.27 m
Width: 4.48 m
Height: 3.29 
Armament: 128mm KwK 44, 7.92mm MG34 

  • Scale: 1/35
  • Item Type: Static Armor
  • Model Brief Length: 326.52mm, Width: 127.77mm, Height: 107.53mm
  • Total Parts: 256 pieces
  • Photo-etched parts: 1 Piece
  • Total Sprues: 6 pieces: hull, turret, tracks
  • Paint Schemes for German Army
  • Released Date: 2007-12
  • More Features: There are 251 parts in light grey plastic: the lower hull, upper hull, a set of full-length tracks, slide-molded one-piece turret, and six finely etched part